News blog

Tlou Energy Ltd

  • BY: Andrew Hore |
  • POSTED: 26/02/2019 |

Tlou Energy Ltd has started production testing at the Lesedi coal bed methane development pod in Botswana. 

The Lesedi 4A lateral well has been drilled and the 4B lateral well is underway. The latter well will complete the current drilling programme.

The Botswana government is still assessing the gas-to-power tender.

Tlou had A$5.52m in cash at the end of 2018.

© 2020 Aim Micro. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

Browse by issue
All issues
Popular tags
All tags

betbrokers, financial, gold, health, leisure, media, mobile, resources, services, technology

AIM Micro feeds

Keep up to date with articles published at AIMMicro.com. Subscribe to AIM Micro RSS Feeds